You don't have javascript enabled. Good luck with that.
Pencarian
PPSU Kelurahan Setu Bangun Tujuh Sumur Resapan
....
photo Nurito - Beritajakarta.id

Setu Urban Village PPSU Personnel Build Seven Infiltration Wells

Total 10 PPSU personnel of Setu Urban Village, Cipayung Sub-district, East Jakarta built 7 infiltration wells in two locations, on Friday (10/29).

This work is targeted to be completed in the next two weeks

Setu Urban Village Head, Jenuri said, infiltration wells were built to anticipate inundation during rainy season. His side deployed 10 PPSU personnel and one drilling machine to build infiltration wells with depth 20 meters each.

"Currently we have built 7 infiltration wells in total. Five of them located on Jl. Kramat Aris and 2 others on Jl. Bantar Jati," he informed.

November, Six Wells Construction in Setiabudi Completed

The construction is still continued since his side targeted to build 12 infiltration wells in the region.

"This work is targeted to be completed in the next two weeks," he mentioned.

Linked News
Popular News indeks
  1. Commission D Legislator Supports Park Monitoring Optimization

    access_time20-01-2025 remove_red_eye1505 personDessy Suciati
  2. Realizing Food Self-Sufficiency, Jakarta Holds Simultaneous Planting Activity

    access_time21-01-2025 remove_red_eye926 personAldi Geri Lumban Tobing
  3. City and Kejati Forge Cooperation for Good Government Governance

    access_time21-01-2025 remove_red_eye392 personFolmer
  4. BMKG Warns of Potential High Rainfall in Jakarta

    access_time22-01-2025 remove_red_eye390 personDessy Suciati
  5. 13 Inter-village Bridges in South Jakarta Revitalized

    access_time16-01-2025 remove_red_eye367 personTiyo Surya Sakti